Edward Isaaks, Ph.D.

 

Professional summary

Dr. Isaaks has 15 years of experience in technical evaluations, exploration property evaluations, research, and design and management of ore reserve assessment programs in North America and overseas.

Education

Ph.D., Geostatistics, Stanford University, CA, USA

M.Sc., Geostatistics, Stanford University, CA, USA

B.Sc., University of British Columbia, Canada

Memberships

Society of Mining, Metallurgy and Exploration.

International Association for Mathematical Geology

AusIMM

Association of Professional Engineers of Saskatchewan (not current because of residency requirements).

Summary of core skills

Reserve audits and fatal-flaw, due diligence evaluations. Resolution of ore reserve/production reconciliation problems. Design of grade control programs. Ore resource and ore reserve modelling.

Employment history

Consulting Geostatistician, 1992-present.

Geostatistician, MRDI, 1991-1992. 

M.Sc. and Ph.D. Student 1982-1991

Project Geostatistician, Esso Resources  1980-1982.

Mine Geologist, Cassiar Asbestos  1977-1980

Seasonal Exploration Geologist, Canadian North, 1968-1977

 

Isaaks & Co. (sole proprietor)

Tintaya Mine, BHP Billiton Tintaya S.A., 2000:  Review the ore reserve modelling methodology and design DDH patterns to prove the ore reserves at several satellite deposits.

Diavik, Diavik Diamond Mines, NT, Canada, 1999:  Implementation of conditional simulation for the estimation of diamond resources. 

Monywa, Ivanhoe Holdings, Myanmar, 1996-1997:  Member of the MRDI feasibility study team for a copper heap leach project.

Turquoise Ridge, First Miss Gold, NV, USA, 1995:  Member of the MRDI feasibility study team for vein gold.

Radomiro Tomic, Codelco Chile, 1998: Extensive review of the long term ore reserve model for the purposes of improving prediction accuracy and increasing confidence in the ore reserve model for expansion plans.

Chuquicamata, Codelco Chile, 1998: A study on the impact of variable bench height on minable reserves as part of a larger engineering feasibility study for the expansion of mining operations.

Chuquicamata, Codelco Chile, 2000: An extensive review of the Chuquicamata long term ore reserve model for the purposes of improving local accuracy for long term mine planning and expansion studies. Also updated the Moly model.

Chuquicamata, Codelco Chile, 1997: An extensive review of the transition zone - low grade sulfide ore reserve model for the purposes of resolving a major reconciliation problem between model predictions and production figures.

Confidential Acquisition Target, Codelco Chile, 1999: Due diligence study on the geologic and mineral resource model for a possible acquisition target.

North Oxides, Chuquicamata, Codelco Chile, 1998: A review of the geologic model using geostatistics and indicator kriging. The objective was to prepare a geologic model with unbiased geologic units in terms of contained ore tonnages.

Radomiro Tomic, Codelco Chile, 1997: The design of a mine plan for the separation of three oxide ore types at the time of mining. The design was based on a conditional simulation model of the oxide ore types at Radomiro Tomic.

Radomiro Tomic, Codelco Chile, 1998: Provided a geostatistical assessment of the uncertainty associated with predicting minable reserves at Radomiro Tomic.

Radomiro Tomic, Codelco Chile, 2000: Review of the short term mine planning ore reserve model for the purposes of resolving a reconciliation problem between the model predictions and production.

San Antonio Project, Codelco Chile, 1997:  Audit of copper resource models.

Agua Rica Deposit, BHP, Argentina 1998: Prepared the ore resource model for a pre-feasibility study of the Agua Rica Copper and Molybdenum Deposit in Argentina.

Robinson Copper-Gold Deposit, BHP, Nevada, 1996: Technical review of the grade control procedure for the purposes of reconciling differences between the short term model predictions and production figures.

San Manuel Copper Deposit, BHP, Arizona, 1996: Technical review of the underground ore reserve model.

Florence copper deposit, BHP, Arizona, 1996: Technical review of the ore resource model for a proposed in-situ leach project.

Sur Sur Deposit, Andina Mine, Codelco Chile, 1997: A Geostatistical review of the Sur Sur copper ore reserve model for the purposes of reconciling production figures with model grade estimates.

Mary-Drinkwater Deposit, Mineral Ridge Resources Inc.1995: Prepared the pre-feasibility gold ore resource model for Mineral Ridge. This work was done through MRDI.

Meikle Deposit, Barrick Goldstrike, Elko, Nevada 1998: Variography and conditional simulation of the Meikle deposit to evaluate and confirm production schedules.

RoseBud Mine, Hecla Mining, 1998: Technical review of the ore reserve model (gold deposit), re-did the variography and implemented geostatistical methods for ore reserve modelling and estimation.

Lucky Friday Mine (poly-metallic), Hecla Mining, 1998: Design of a diamond drill pattern for the purposes of enabling the classification of mining reserves as proven and probable.

Gold Hunter South Vein, Hecla Mining, 1998: Technical Review of current methodology used to prepare ore reserve model and implemented new estimation methods.

Meridian Gold Project, Standard Bank of London, 1999: Due diligence evaluation of a potential acquisition target by the Meridian Gold Project.

Ray Mine, Asarco Inc., 2000: Technical review and re-calculation of ore reserves using conditional simulation.

 

MRDI

Jerritt Canyon, FMC Gold, NV, USA, 1991:  Participated in the reserve audits for Carlin-type Gold.

Refugio, Bema Gold, 1991: Geostatistician member of MRDI feasibility study team for the Refugio Verde Deposit.

Lone Tree Gold Mine, Santa Fe Pacific, 1995:  Review of long term ore reserve model for the purposes of resolving reconciliation problems between model predictions and production figures. Re-designed and implemented a new grade control procedure.

Andacollo, Canada Tungsten, Chile, 1994:  Geostatistician, participated in the reserve audits for porphyry copper.  

Fort Knox Gold Deposit, Fairbanks Gold Mining Inc. 1994: Technical review of the ore resource model. Validated the ore reserve model and production schedule predictions for a feasibility study using a conditional simulation model of the deposit.

Lihir Gold Deposit, Kennecotte Copper, 1991: Prepared a conditional simulation model of the ore resources to validate the proposed mine plan and production schedule for the feasibility study.

Greens Creek, Kennecotte Copper, 1992: Technical review of the ore resource (poly metallic) model. Prepared new resource model using geostatistical methods.

Voisey Bay, Confidential client, 1993:  Technical review of  Nickel-Cobalt-  Resources as potential acquisition target.

Malawi, CEGB, 1990: Modelled the uranium geologic resources of the Kayalakara deposit for the purposes of a feasibility study.

 

Consulting Projects while doing Graduate work at Stanford

Stillwater, Stillwater Mining, MT, USA, 1983:  Implementation of indicator geostatistics for modelling of platinum-palladium reserves.

 

Canada Wide Mines (Esso Resources), 1980-1982

Midwest Lake, Saskatchewan, Canada:  Project Geostatistician responsible for modelling the uranium and nickel arsenide ore reserves of the Midwest Lake deposit. I Also built a conditional simulation model of the uranium and nickel arsenide mineralizations for the purposes of designing a mining – stockpile – reclamation plan to achieve an acceptable blend of mill head grades.

 

Cassiar Asbestos 1977 - 1980

Cassiar, Northern B.C., Canada:  Mine Geologist with primary responsibilities for grade control (production); annual infill DDH drilling and updating the ore reserve model; and summer exploration programs in the immediate area of the mine. Managed a 2000 foot exploration drift for the purposes of intersecting and diamond drilling the ore deposit at depth.

Seasonal Exploration Geologist 1972-1977:

Lytton Minerals 1967-1968:  Summer exploration programs for base metals in the Cassiar Mountains, Northern British Columbia.

J.S. Vincent 1969-1970: Summer exploration programs for lead-zinc in the Anvil Range, and for base metals in the Kluwani Range, Yukon T.

 

PUBLICATIONS:
Books

Isaaks, E.H. and Srivastava, R.M., 1989, An Introduction to Applied Geostatistics, Oxford University Press, New York, 561 p.

Thesis

The application of Monte Carlo methods to the analysis of spatially correlated data, Ph.D. thesis, Stanford University

Thesis

Risk qualified mappings for hazardous waste sites: A case study in distribution free geostatistics, M.Sc. thesis, Stanford University.

Reviewed Papers

Isaaks, E.H. 2004, “The kriging oxymoron: Conditionally unbiased and accurate prediction      ( 2nd Edition), submitted for publication in the proceedings of the 2004 Geostat Congress.

Isaaks, E.H. and Srivastava, R.M., 1988, ``Spatial continuity measures for probabilistic and deterministic geostatistics'', Mathematical Geology, vol. 20, no. 4, p. 313-341.

Journel, A.G., and Isaaks, E.H., 1985, ``Simulation of mixed mineralizations: Application to a Saskatchewan Uranium Deposit'', Mathematical Geology, vol. 17, no. 1, p. 1-15.

Isaaks, E.H., 1983, "Indicator Simulation: Application to a Saskatchewan Uranium Deposit'', in G. Verley, et al (ed.) Proceedings of the NATO Advanced Study Institute, D. Reidel, Dordrecht, Holland.

Received the Best Paper Award for a presentation at the 1987 Mathematical Geologists of United States Conference in Redwood City, California.

 

Return to What's New